Henan Weihua Heavy Machinery Co., Ltd.

Anode Block Crane,Roasting Anode Crane,Anode Carbon Overhead Crane

Home > Products > Overhead Crane > Metallurgy Industry Crane > Anode Carbon Stacking Crane

Anode Carbon Stacking Crane

Basic Info

Model No.WH

BrandWeihua

CertificationOther

ConditionNew

Operation FormCabin

Maximum Lifting Height15-20m

Maximum Lifting Weight20-50t

Main Girder FormDouble Girder

TypeMetallurgical

Additional Info

PackagingWooden Case, Rain Cloth, etc.

Productivity150 Sets

TransportationOcean,Land

Place of OriginChina

Supply Ability20 Sets Per Month

CertificateISO 9001 ISO 14001 OHSAS 18001 GB/T 19001-2008/ISO 9001: 2008

HS Code8426112000

PortQingdao,Tianjin,Shanghai

Payment TypeL/C,T/T

IncotermFOB,CFR,CIF,EXW

Product Description

The anode carbon stacking crane is a dedicated loading and unloading equipment for stacking and transport raw anode blocks and roasting anode blocks, which is used at the carbon block factory and the carbon block warehouse of electrolytic aluminum plant. It can be used in environments containing harmful substances such as carbon powder, hydrocarbon, baking fume, etc.


Anode Carbon Stacking Crane


This anode carbon stacking crane consists of double girders, fixture lifting mechanism, opening and closing mechanism, Electric Hoist. This product is equipped with closed-circuit monitoring, automatic detection, automatic positioning, automatically determine the fixture leakage, automatically determine the height of carbon block stacking and other functions.


Crane Clamp


Working:

1. Stack and transport raw anode blocks and roasting anode blocks (19 blocks in 1 group);

2. For waste block removal and qualified block insertion;

3. A 5 tons electric hoist for lifting the sporadic items.


Anode Carbon Stacking Device


Features:

1. Mechanical design fixture need no power source, environmental protection and energy saving.

The fixture device is the core of the crane. Fixture device is composed of fixture beam and 19 single fixtures. With fully mechanical design, it uses connecting rod structure and its own gravity to achieve the function of closing and open without power source. Easy maintenance, long service life.


2. Assembly before welding method to ensure product accuracy.

Usually welding before assembly with large welding space and simple operation, while this equipment requires high precision, so we adopt assembly before welding, so the welding space is very small, the narrowest place is only 22cm, greatly increased the difficulty of welding operation.


Crane Transport



Product Categories : Overhead Crane > Metallurgy Industry Crane

Product Images

  • Anode Carbon Stacking Crane
  • Anode Carbon Stacking Crane
  • Anode Carbon Stacking Crane
  • Anode Carbon Stacking Crane
Email to this supplier
  • *Subject:
  • *Messages:
    Your message must be between 20-8000 characters